Department of Infrastructure and Regional Development print logo Building our Future print logo

Epping Avenue - 060243-15NSW-RTR

Funding Program:Roads to Recovery Program
Status:Completed
Transport Mode:Road
Expected Start/Finish:Mar 2016 - Apr 2016
Australian Government Contribution:$150,000
Local Council/Shire:Parramatta City Council
State:NSW

Project Description

The road is affected by large amount of cracks and some pavement failures. The surface is old and oxidised. Existing pavement defects and multiple patches have increased road roughness.

The proposed work includes reconstruction of trafficable pavement areas with asphalt and resurfacing with asphalt. Length = 300 m; Width = 12 m; Area = 3600 m2.

Total cost of proposed project is $237,711

Disclaimer: The material contained in this site is made available on the understanding that the Department is not thereby engaged in rendering professional advice for a particular purpose. Before relying on the material in any important matter, users should carefully evaluate the accuracy, completeness and relevance of the information for their purposes and should obtain appropriate professional advice relevant to their particular circumstances.


Project details last updated: 10/07/2016