Old Main Jindivick Road, JINDIVICK - 060282-15VIC-RTR

A A A

Funding Programme:Roads to Recovery Programme
Status:Completed
Transport Mode:Road
Expected Start/Finish:Feb 2016 - Jun 2016
Australian Government Contribution:$262,057
Local Council/Shire:Baw Baw Shire Council
State:VIC

Project Description

Differential subgrade settlement, pavement failures, rutting, shoving and stripping.

Clear all vegetation upto the edge of the drain. Sidecast and treat the sub grade for the entire stretch suffered from differential settlement of the subgrade starting from approximate Chainage 300m until Chainage 1475m. Excavate, pulverise and stabilise with cement, shape, relay and compact to uniform depth of 250mm. Apply 100mm thick layer of 20mm nominal size class 2 fine crushed rock. Apply two coat spray seal. Intsall kerb and channel on both sides from approximate Chainage 775m until Chainage 1175m along the cutting. Clean and reshape existing drain. Install subsoil drains below the subgrade. Replace the existing culvert with 375mm diameter pipe culvert with endwalls on both sides.

Disclaimer: The material contained in this site is made available on the understanding that the Department is not thereby engaged in rendering professional advice for a particular purpose. Before relying on the material in any important matter, users should carefully evaluate the accuracy, completeness and relevance of the information for their purposes and should obtain appropriate professional advice relevant to their particular circumstances.


Project details last updated: 10/08/2016