Ulungra Springs Road (Rural) - 060435-15NSW-RTR

Funding Program:Roads to Recovery Program
Status:Completed
Transport Mode:Road
Expected Start/Finish:Apr 2016 - Apr 2016
Australian Government Contribution:$112,597
Local Council/Shire:Gilgandra Council
State:NSW

Project Description

Single span timber bridge, constructed in 1946 (according to Council records) located over the Yarragrin creek, has been deemed unsafe and due for replacement. Bridge will be replaced with a low level concrete structure with two reinforced concrete pipes.

Demolish existing structure, Lay two 6 metre lengths of 600mm diameter reinforced concrete pipe, box up and pour head walls and slab for low level concrete structure (12metres X 6metres X 1.5metres). Once concrete has cured, re-establish approaches and bitumen seal approaches

Disclaimer: The material contained in this site is made available on the understanding that the Department is not thereby engaged in rendering professional advice for a particular purpose. Before relying on the material in any important matter, users should carefully evaluate the accuracy, completeness and relevance of the information for their purposes and should obtain appropriate professional advice relevant to their particular circumstances.