Department of Infrastructure and Regional Development print logo Building our Future print logo

Corella Road, Kirrawee - 060454-15NSW-RTR

Funding Program:Roads to Recovery Program
Status:Completed
Transport Mode:Road
Expected Start/Finish:Mar 2016 - May 2016
Australian Government Contribution:$105,813
Local Council/Shire:Sutherland Shire Council
State:NSW

Project Description

Road pavement is in need of renewal and require kerb & gutter and stormwater drainage upgrade. Surface course is in poor condition and water is infiltrating the base layer due to inadequate drainage system. cracked and missing section of kerb and gutter need renewal.

Proposed works will replace the base course with semi-flexible deeplift. Road pavement rehabilitation works for a length of 140m and width of 4.5m. Works include mill and fill with 70mm thick deeplift asphalt and 30mm surface course. Works also include provision of kerb and gutter and drainage upgrade.

Disclaimer: The material contained in this site is made available on the understanding that the Department is not thereby engaged in rendering professional advice for a particular purpose. Before relying on the material in any important matter, users should carefully evaluate the accuracy, completeness and relevance of the information for their purposes and should obtain appropriate professional advice relevant to their particular circumstances.


Project details last updated: 10/08/2016