Department of Infrastructure, Regional Development and Cities print logo Building our Future print logo

Trungley Hall Road (Rural Road) - 060455-15NSW-RTR

Funding Program:Roads to Recovery Program
Status:Completed
Transport Mode:Road
Expected Start/Finish:Feb 2016 - Dec 2017
Australian Government Contribution:$1,309,864
Local Council/Shire:Temora Shire Council
State:NSW

Project Description

Deformed, failing pavement. Old drainage infrastructure with major pipe joint displacement at most pipe culvert structures.

Pipe Culvert Replacements at CH 0.54km, CH 2.44km, CH 3.44km, CH 4.34km and Culvert extension at CH 4.74km Rip and shape existing pavement to design subgrade level, import 200mm layer of DGS20 pavement material, shape pavement material to finished surface level, trim and 2 coat bitumen seal

Disclaimer: The material contained in this site is made available on the understanding that the Department is not thereby engaged in rendering professional advice for a particular purpose. Before relying on the material in any important matter, users should carefully evaluate the accuracy, completeness and relevance of the information for their purposes and should obtain appropriate professional advice relevant to their particular circumstances.


Project details last updated: 10/03/2018