Jump to Content

Burraneer Bay Road, Cronulla - 060469-15NSW-RTR

A A A

Funding Programme:Roads to Recovery Programme
Status:Completed
Transport Mode:Road
Expected Start/Finish:Feb 2016 - Apr 2016
Australian Government Contribution:$203,067
Local Council/Shire:Sutherland Shire Council
State:NSW

Project Description

Road pavement base course has degraded, causing the wearing surface to crack severely. Existing wearing surface severely oxidised, potholes in patches.

Heavy patching of 125 sq.m pavement area with 120mm asphalt concrete and then re-surfacing entire section (3250 sq.m ) with 40mm thick asphalt concrete overlay.

Disclaimer: The material contained in this site is made available on the understanding that the Department is not thereby engaged in rendering professional advice for a particular purpose. Before relying on the material in any important matter, users should carefully evaluate the accuracy, completeness and relevance of the information for their purposes and should obtain appropriate professional advice relevant to their particular circumstances.


Project details last updated: 10/08/2016