Devonshire Street, Walkerville - 060497-15SA-RTR

Funding Program:Roads to Recovery Program
Transport Mode:Road
Expected Start/Finish:Feb 2016 - May 2016
Australian Government Contribution:$30,000
Local Council/Shire:Corporation of the Town of Walkerville

Project Description

Surface is ravelling and stones are not longer interlocking with binder material. binder is crumbly. pothole maintenance costs have increased on this section of road. 8m x 125m Area = 960m2 10.5m x 130m Area = 1365m2

300-500mmm profiling along both side of kerb. 30m2 of isolated patching. Preparation for road surface overlay and application of with new asphalt surface

Total cost of proposed project is $96,904

Disclaimer: The material contained in this site is made available on the understanding that the Department is not thereby engaged in rendering professional advice for a particular purpose. Before relying on the material in any important matter, users should carefully evaluate the accuracy, completeness and relevance of the information for their purposes and should obtain appropriate professional advice relevant to their particular circumstances.