Department of Infrastructure and Regional Development print logo Building our Future print logo

Huntingwood Drive, Huntingwood - 060506-15NSW-RTR

Funding Program:Roads to Recovery Program
Status:Completed
Transport Mode:Road
Expected Start/Finish:Mar 2016 - Jun 2016
Australian Government Contribution:$379,656
Local Council/Shire:Blacktown City Council
State:NSW

Project Description

This road is a major industrial road which has a high volume of heavy vehicles. The road has extensive areas of crocodile cracking and rutting indicating that the pavement has excessive movement. The extensive cracking also allows for additional moisture to enter the base material and accelerate the failure. Some areas are displaying leaching of the pavement material through the asphalt. Some areas have the asphalt wearing course breaking away from the pavement due to the excessive deflections being experienced by the pavement.

Mill out the existing pavement to a depth of 150mm and replacement with asphalt. Work also includes the reconstruction of damaged sections of kerb and gutter.

Disclaimer: The material contained in this site is made available on the understanding that the Department is not thereby engaged in rendering professional advice for a particular purpose. Before relying on the material in any important matter, users should carefully evaluate the accuracy, completeness and relevance of the information for their purposes and should obtain appropriate professional advice relevant to their particular circumstances.


Project details last updated: 10/08/2016