Jump to Content

Narrabeen Park Parade Warriewood - 060516-15NSW-RTR

A A A

Funding Programme:Roads to Recovery Programme
Status:Completed
Transport Mode:Road
Expected Start/Finish:Mar 2016 - May 2016
Australian Government Contribution:$182,411
Local Council/Shire:Pittwater Council
State:NSW

Project Description

The existing old road pavement has an unacceptable ride quality due to deep lift in areas, numerous potholes and sub-base failures.

The work proposed is to remove approximately 50-100mm depth of existing sealed pavement over a length of 200 metres x 10 metres and then resurface with new asphalt.

Disclaimer: The material contained in this site is made available on the understanding that the Department is not thereby engaged in rendering professional advice for a particular purpose. Before relying on the material in any important matter, users should carefully evaluate the accuracy, completeness and relevance of the information for their purposes and should obtain appropriate professional advice relevant to their particular circumstances.


Project details last updated: 10/08/2016