Koombana Drive, Bunbury - 060730-15WA-RTR

A A A

Funding Programme:Roads to Recovery Programme
Status:Completed
Transport Mode:Road
Expected Start/Finish:Mar 2016 - Apr 2017
Australian Government Contribution:$917,410
Local Council/Shire:City of Bunbury
State:WA

Project Description

1. Drainage and wave action is undermining the road and road pavement. Koombana Drive is recognised as an important cycle link in the Bunbury Bike Plan and the Greater Bunbury Bicycle Master Plan. Shoulder widening will allow for on road cycle lanes. 2. The Dolphin Discovery Centre and Department of Parks and Wildlife (DPaW) development sites are to be located at opposite sites on either side of Koombana Drive at 2.16 to 2.37 SLK. This will generate increased traffic volumes and movements at this site. A new roundabout at this location will allow greater control of vehicle movements entering and exiting both sites.

Widen and seal from 10m width, reconstruct embankment to restore formation along Koombana Drive. Installation of a roundabout from 2.16 to 2.37 SLK.

Total cost of proposed project is $4,301,412

Disclaimer: The material contained in this site is made available on the understanding that the Department is not thereby engaged in rendering professional advice for a particular purpose. Before relying on the material in any important matter, users should carefully evaluate the accuracy, completeness and relevance of the information for their purposes and should obtain appropriate professional advice relevant to their particular circumstances.


Project details last updated: 10/08/2017