Project Description

Excessive pooling of water on road during minor storm events, posing a considerable risk to vehicles and pedestrians due to its depth (camber of the road), close proximity to the highway intersection and to the driveway access of a caravan park and adjacent shop.

Installation of a 2-bay side entry pit into the kerbing of Harrod Street, connection of infrastructure to Council's underground stormwater network, stabilisation and resealing of the surrounding road pavement, and remediation ofthe adjacent footpath which will be impacted during the works.

Disclaimer: The material contained in this site is made available on the understanding that the Department is not thereby engaged in rendering professional advice for a particular purpose. Before relying on the material in any important matter, users should carefully evaluate the accuracy, completeness and relevance of the information for their purposes and should obtain appropriate professional advice relevant to their particular circumstances.


Project details last updated: 10/08/2016