Darlington Drive, Banora Point - 060843-15NSW-RTR

A A A

Funding Programme:Roads to Recovery Programme
Status:Completed
Transport Mode:Road
Expected Start/Finish:May 2016 - Jul 2016
Australian Government Contribution:$161,736
Local Council/Shire:Tweed Shire Council
State:NSW

Project Description

The existing sealed pavement of this sub-arterial road is in poor condition with numerous structural defects including cracking, rutting and localised pavement failures. The road provides poor ride quality for users and requires frequent patching with consequent high maintenance cost.

Rehabilitation of the existing pavement by in-situ stabilisation with cement based binder, followed by spray sealing and asphalt surfacing.

Disclaimer: The material contained in this site is made available on the understanding that the Department is not thereby engaged in rendering professional advice for a particular purpose. Before relying on the material in any important matter, users should carefully evaluate the accuracy, completeness and relevance of the information for their purposes and should obtain appropriate professional advice relevant to their particular circumstances.


Project details last updated: 10/11/2016