Sutherland Street, Kingscliff - 060861-15NSW-RTR

A A A

Funding Programme:Roads to Recovery Programme
Status:Completed
Transport Mode:Road
Expected Start/Finish:Jun 2016 - Dec 2016
Australian Government Contribution:$1,024,620
Local Council/Shire:Tweed Shire Council
State:NSW

Project Description

Existing 4 span timber road traffic bridge is in very poor condition and has a very short expected remaining life due to deteriorated condition of timber piles and headstocks.

Replace the existing bridge with a two-span two-lane concrete bridge supported by cast concrete piles socketed into bedrock. Deck width 8.2 m between safety barriers.

Total cost of proposed project is $3,325,341

Disclaimer: The material contained in this site is made available on the understanding that the Department is not thereby engaged in rendering professional advice for a particular purpose. Before relying on the material in any important matter, users should carefully evaluate the accuracy, completeness and relevance of the information for their purposes and should obtain appropriate professional advice relevant to their particular circumstances.


Project details last updated: 10/08/2017