Jump to Content

Dampier Street (Rural Road) - 060959-15WA-RTR

A A A

Funding Programme:Roads to Recovery Programme
Status:Completed
Transport Mode:Road
Expected Start/Finish:Mar 2016 - Mar 2017
Australian Government Contribution:$112,979
Local Council/Shire:Shire of Mt Marshall
State:WA

Project Description

The existing unsealed surface becomes very slippery when wet, mainly due to the surface being primarily clay.

Construct a new 9.0 meter wide carriageway pavement with a 7.0 meter wide seal width, by forming up the existing pavement, importing new gravel material, water binding spreading and compacting this material and finishing it to accept a new 2 coat emulsion primerseal for the entire 370 meter section. Some minor drainage works will also be required.

Disclaimer: The material contained in this site is made available on the understanding that the Department is not thereby engaged in rendering professional advice for a particular purpose. Before relying on the material in any important matter, users should carefully evaluate the accuracy, completeness and relevance of the information for their purposes and should obtain appropriate professional advice relevant to their particular circumstances.


Project details last updated: 17/05/2017