Jump to Content

Oval Avenue, Caloundra - 061034-15QLD-RTR

A A A

Funding Programme:Roads to Recovery Programme
Status:Completed
Transport Mode:Road
Expected Start/Finish:Nov 2015 - Nov 2015
Australian Government Contribution:$130,203
Local Council/Shire:Sunshine Coast Regional Council
State:QLD

Project Description

The proposed section has the following defects: extensive ravelling, oxidation and weathering of the asphalt surface and cracking in some areas. The surface has moderate failures (for example, potholes and patches).

Asphalt Resurfacing: Profile edges to key-in with the concrete kerb and channel; Waterproofing and crack alleviation bitumen sprayed seal; and 30mm thick Dense Graded Asphalt Overlay (using size 10mm nominal aggregate).

Disclaimer: The material contained in this site is made available on the understanding that the Department is not thereby engaged in rendering professional advice for a particular purpose. Before relying on the material in any important matter, users should carefully evaluate the accuracy, completeness and relevance of the information for their purposes and should obtain appropriate professional advice relevant to their particular circumstances.


Project details last updated: 10/08/2016