Blackgate Road - 061190-15VIC-RTR

Funding Program:Roads to Recovery Program
Transport Mode:Road
Expected Start/Finish:Nov 2015 - Jan 2016
Australian Government Contribution:$194,000
Local Council/Shire:City of Greater Geelong

Project Description

Gravel road shoulders have minimal material and old asphalt seal is showing signs of distress (ie. longitudinal cracking, rutting and potholing)

Reconstruction and asphalt sealing of shoulders on both sides of road and profile existing failing asphalt running lane surface and replace with 100 millimetre deep lift asphalt patch in required locations and provide a 40 millimetre asphalt overlay to full length (300 metres) and width (10 metres) of road

Disclaimer: The material contained in this site is made available on the understanding that the Department is not thereby engaged in rendering professional advice for a particular purpose. Before relying on the material in any important matter, users should carefully evaluate the accuracy, completeness and relevance of the information for their purposes and should obtain appropriate professional advice relevant to their particular circumstances.

Project details last updated: 10/03/2016