Range Road (Portland) - 061310-15NSW-RTR

Funding Program:Roads to Recovery Program
Transport Mode:Road
Expected Start/Finish:Feb 2015 - Mar 2015
Australian Government Contribution:$58,087
Local Council/Shire:City of Lithgow Council

Project Description

Subsurface instability has caused mass pavement failure over a 300m section. Such failures include surface cracking, potholing, shoving, edge cracking, depressions and raveling.

The seal for this 300m section will be entirely removed. The subsurface will be ripped and blended with high quality road base. The road base will then be sufficiently compacted and allowed to sit for two weeks prior to seal to determine any further subsurface deficiencies. Upon rectification of any further issues, a two-coat 20/10 seal will be laid 10m wide and line marked accordingly. Table drains will be reformed and stormwater culverts and pipes will be cleared to rectify drainage issues.

Disclaimer: The material contained in this site is made available on the understanding that the Department is not thereby engaged in rendering professional advice for a particular purpose. Before relying on the material in any important matter, users should carefully evaluate the accuracy, completeness and relevance of the information for their purposes and should obtain appropriate professional advice relevant to their particular circumstances.

Project details last updated: 10/05/2016