Subsurface instability has caused consistent pavement failure over two 500m sections. Such failures include surface cracking, potholing and edge cracking. Patching the road has proved to only temporarily solve the issue.

The seal for these two 500m sections will be entirely removed. The subsurface will be ripped and blended with high quality road base. The road base will then be sufficiently compacted and allowed to sit for one weeks prior to seal to determine any further subsurface deficiencies. Upon rectification of any further issues, a two-coat 14/7 seal will be laid 8m wide and line marked accordingly. Table drains will be reformed and stormwater culverts and pipes will be cleared to rectify drainage issues.

Disclaimer: The material contained in this site is made available on the understanding that the Department is not thereby engaged in rendering professional advice for a particular purpose. Before relying on the material in any important matter, users should carefully evaluate the accuracy, completeness and relevance of the information for their purposes and should obtain appropriate professional advice relevant to their particular circumstances.


Project details last updated: 10/05/2016