McCormicks Road - 061588-15VIC-RTR

Funding Program:Roads to Recovery Program
Status:Completed
Transport Mode:Road
Expected Start/Finish:Jan 2016 - Apr 2016
Australian Government Contribution:$287,432
Local Council/Shire:Frankston City Council
State:VIC

Project Description

Currently, a gravel shoulder exists and does not provide any protection to several nearby driving hazards such as a steep table drain, and cars appear to be overtaking turning vehicles on this gravel shoulder. There are also issues with the bus stopping in the through traffic lane, causing stoppages and some cars trying to overtake the parked bus by veering into the oncoming traffic lane. Additionally, several pavement defects are noticeable which will result in an unsafe road surface in the near future.

Widening of McCormicks Road will occur at the Stud Court intersection for ~120m, and a bus recess will be constructed at the location of the existing bus stop (opposite 204 McCormicks Road). This involves road widening, construction of kerb and channel and drainage. An asphalt overlay will be completed from Hall Road to Brunnings Road to ensure a safe and consistent driving surface, following the widening works.

Disclaimer: The material contained in this site is made available on the understanding that the Department is not thereby engaged in rendering professional advice for a particular purpose. Before relying on the material in any important matter, users should carefully evaluate the accuracy, completeness and relevance of the information for their purposes and should obtain appropriate professional advice relevant to their particular circumstances.