Rosella Road, Parkdale - 061736-15VIC-RTR

Funding Program:Roads to Recovery Program
Status:Completed
Transport Mode:Road
Expected Start/Finish:Apr 2016 - Sep 2016
Australian Government Contribution:$200,000
Local Council/Shire:Kingston City Council
State:VIC

Project Description

Flexible road pavement is in poor condition and has failed for approximately 60% of the roads length; it has extensive cracking rutting and heaving failures. Kerb & channel is greater than 75% disjointed and requires replacing. Drainage improvements will be incorporated into this project.

Works involve the reconstruction of Rosella Road, including new kerb and channel and reconstruction of the existing asphalt road pavement. The works consist of approximately: • 664m of kerb and channel • 2377m2 of pavement reconstruction • 300m stormwater drainage • 19 drainage pits • 810m2 of residential footpath • 810m2 of residential vehicle crossings • Signs & Line marking • Associated works

Total cost of proposed project is $540,023

Disclaimer: The material contained in this site is made available on the understanding that the Department is not thereby engaged in rendering professional advice for a particular purpose. Before relying on the material in any important matter, users should carefully evaluate the accuracy, completeness and relevance of the information for their purposes and should obtain appropriate professional advice relevant to their particular circumstances.


Project details last updated: 10/11/2016