Department of Infrastructure, Regional Development and Cities print logo Building our Future print logo

McMillan Street, Clayton South - 061737-15VIC-RTR

Funding Program:Roads to Recovery Program
Status:Completed
Transport Mode:Road
Expected Start/Finish:Nov 2015 - May 2016
Australian Government Contribution:$150,458
Local Council/Shire:Kingston City Council
State:VIC

Project Description

Flexible road pavement is in poor condition and has failed for approximately 60% of the roads length; it has extensive cracking rutting and heaving failures. Kerb & channel is greater than 75% disjointed and requires replacing. Drainage improvements and traffic management works will be incorporated into this project.

Works involve road reconstruction and shared path construction, and consist of: • 3000m² of excavation for road pavement, footpaths and vehicle crossings, • 1650m² of asphalt pavement reconstruction, • 475m of concrete kerb & channel • 650m² concrete footpath paving • 160m² concrete vehicle crossings • 300m of drainage 225mm to 450mm Dia. Pipes • associated drainage pits

Total cost of proposed project is $527,319

Disclaimer: The material contained in this site is made available on the understanding that the Department is not thereby engaged in rendering professional advice for a particular purpose. Before relying on the material in any important matter, users should carefully evaluate the accuracy, completeness and relevance of the information for their purposes and should obtain appropriate professional advice relevant to their particular circumstances.


Project details last updated: 10/07/2016