Department of Infrastructure, Regional Development and Cities print logo Building our Future print logo

Franklin Street, Manjimup - 061847-15WA-RTR

Funding Program:Roads to Recovery Program
Status:Completed
Transport Mode:Road
Expected Start/Finish:Apr 2016 - Mar 2017
Australian Government Contribution:$607,786
Local Council/Shire:Shire of Manjimup
State:WA

Project Description

The existing sub-grade is failing causing the road to deform significantly. The existing culverts are in poor condition and/or have insufficient capacity.

Stage 1: Undertake survey, design and purchase of drainage materials to enable stage 2 works: construct the road with sufficient pavement stability and thickness so that it is suitable for heavy vehicle access to the Manjimup industrial estate. Construct to the standard detailed in the Shire policy: Road Hierarchy for a road in an industrial estate. replace culverts and headwalls as required. Place kerbing as detailed in the policy.

Disclaimer: The material contained in this site is made available on the understanding that the Department is not thereby engaged in rendering professional advice for a particular purpose. Before relying on the material in any important matter, users should carefully evaluate the accuracy, completeness and relevance of the information for their purposes and should obtain appropriate professional advice relevant to their particular circumstances.


Project details last updated: 10/10/2017