Department of Infrastructure, Regional Development and Cities print logo Building our Future print logo

Coramba Road Megan - 062087-15NSW-RTR

Funding Program:Roads to Recovery Program
Status:Completed
Transport Mode:Road
Expected Start/Finish:Apr 2016 - May 2016
Australian Government Contribution:$115,728
Local Council/Shire:Bellingen Shire Council
State:NSW

Project Description

Existing pavement surface is uneven with minor deformations and edge failures. the wearing surface is showing signs of oxidisation coming to the end of useful life.

Surface corrections and heavy patching to existing pavement and shoulders. Application of new bitumen seal wearing surface. Seal design was improved to achieve an improved wearing surface finish as temperature in pavement was unable to reach optimum seal temperature requiring an alternative emulsion and stone treatment.

Disclaimer: The material contained in this site is made available on the understanding that the Department is not thereby engaged in rendering professional advice for a particular purpose. Before relying on the material in any important matter, users should carefully evaluate the accuracy, completeness and relevance of the information for their purposes and should obtain appropriate professional advice relevant to their particular circumstances.


Project details last updated: 10/08/2016