Department of Infrastructure, Regional Development and Cities print logo Building our Future print logo

Hungerford Road, (Rural LRRS Road), - 062099-15QLD-RTR

Funding Program:Roads to Recovery Program
Transport Mode:Road
Expected Start/Finish:May 2016 - Dec 2016
Australian Government Contribution:$80,000
Local Council/Shire:Bulloo Shire Council

Project Description

190m long section of road in a sealed causeway with existing 8 x 1200 RCP culverts on a main waterway channel at chainage 2.40. Causeway sealed width is 2 traffic lane 7.0m, existing culvert is single traffic lane 5.5m width. Narrowing of pavement across culvert in this causeway creates a hazard to the travelling public, particularly during flood events when pavement is overtopped and obscured by flood waters.

Extend existing 8 x 1200 RCP's including new concrete headwalls and apron to facilitate pavement widening overtop. Construct unbound pavement widening with bitumen seal to provide consistent 7.0m sealed carriageway width through full length of causeway.

Disclaimer: The material contained in this site is made available on the understanding that the Department is not thereby engaged in rendering professional advice for a particular purpose. Before relying on the material in any important matter, users should carefully evaluate the accuracy, completeness and relevance of the information for their purposes and should obtain appropriate professional advice relevant to their particular circumstances.

Project details last updated: 10/02/2017