Fraser Drive, Banora Point - 062196-15NSW-RTR

Funding Program:Roads to Recovery Program
Transport Mode:Road
Expected Start/Finish:May 2016 - Jul 2016
Australian Government Contribution:$204,291
Local Council/Shire:Tweed Shire Council

Project Description

The existing sealed road is in poor condition with numerous surface defects, pavement failures and extensive cracking. The cracking is allowing moisture to penetrate the pavement causing accelerated deterioration and poor ride quality to road users. Repair of the frequent and repetitive pavement and surface failures causes high maintenance expenditure.

Rehabilitation of the road pavement by in-situ stabilisation and application of a new asphalt surface. The road alignment and width will remain similar to the existing road.

Disclaimer: The material contained in this site is made available on the understanding that the Department is not thereby engaged in rendering professional advice for a particular purpose. Before relying on the material in any important matter, users should carefully evaluate the accuracy, completeness and relevance of the information for their purposes and should obtain appropriate professional advice relevant to their particular circumstances.

Project details last updated: 10/11/2016