Department of Infrastructure, Regional Development and Cities print logo Building our Future print logo

Windurong Road (Rural) - 062483-15NSW-RTR

Funding Program:Roads to Recovery Program
Transport Mode:Road
Expected Start/Finish:Apr 2016 - Apr 2016
Australian Government Contribution:$45,135
Local Council/Shire:Gilgandra Council

Project Description

Regionally Significant Road formed from natural black soil. Sections of the road have been gravel sheeted over a period of 25 years this has since been blown off and washed away. The existing pavement is prone to deep lateral rutting and potholing as well as significant pavement failure over a distance of 300 metres.

Reconstruct area of failed pavement, reshape road and gravel sheet – Win and cart gravel – Spread gravel at 6m wide X 130mm thick, compact to 100mm. Re-establish table and mitre drains.

Disclaimer: The material contained in this site is made available on the understanding that the Department is not thereby engaged in rendering professional advice for a particular purpose. Before relying on the material in any important matter, users should carefully evaluate the accuracy, completeness and relevance of the information for their purposes and should obtain appropriate professional advice relevant to their particular circumstances.

Project details last updated: 10/08/2016