Department of Infrastructure, Regional Development and Cities print logo Building our Future print logo

Challenger Avenue Manning - 062530-15WA-RTR

Funding Program:Roads to Recovery Program
Transport Mode:Road
Expected Start/Finish:Jun 2016 - Aug 2016
Australian Government Contribution:$80,014
Local Council/Shire:City of South Perth

Project Description

The existing asphalt wearing surface has reached the end of its serviceable life, pavement has extensive cracking and uneven surface and as a bus route where "quality of ride" is paramount, requires prompt rehabilitation to prevent further, more expensive degradation to the pavement.

Remove and replace existing kerbing, adjust/replace stormwater drainage structures, profile existing surface to a minimum depth of 20mm, apply SAMI seal or asphalt interlayer to exposed base course and overlay full width with "Stone Mastic Asphalt"

Disclaimer: The material contained in this site is made available on the understanding that the Department is not thereby engaged in rendering professional advice for a particular purpose. Before relying on the material in any important matter, users should carefully evaluate the accuracy, completeness and relevance of the information for their purposes and should obtain appropriate professional advice relevant to their particular circumstances.

Project details last updated: 10/11/2017