Greenethorpe-Bumbaldry Road (Rural Road) - 062878-15NSW-RTR

Funding Program:Roads to Recovery Program
Transport Mode:Road
Expected Start/Finish:May 2017 - Jun 2017
Australian Government Contribution:$45,000
Local Council/Shire:Weddin Shire Council

Project Description

This section of Greenethorpe -Bumbaldry Road consists of only a 6.4m wide bituminous surface. Currently vehicles have to drop at least one wheel off the sealed pavement onto shoulders to pass. Council has received numerous complaints that B-Double trucks use this road illegally. These put strains on the edge of the pavement which requires constant repairs and reduces safety to traffic especially to the heavy vehicles including school buses and grain trucks. Greenethorpe - Bumbaldry Road will ultimately become a B-double route after the completion of this project.

It is intended to widen the road formation to 12 metres with a 8 to 12 metres wide bitumen. This project will include erecting & removing traffic control at the site, vegetation removal, removing & reinstating signs, guardrailing & guideposts, clearing, excavation, adding gravel, widening the pavement, reconstructing kerb and gutter, shaping, compacting, trimming, primersealing incorporating 10mm aggregates with a 5mm scatter coat and line marking

Total cost of proposed project is $90,000

Disclaimer: The material contained in this site is made available on the understanding that the Department is not thereby engaged in rendering professional advice for a particular purpose. Before relying on the material in any important matter, users should carefully evaluate the accuracy, completeness and relevance of the information for their purposes and should obtain appropriate professional advice relevant to their particular circumstances.