Department of Infrastructure, Regional Development and Cities print logo Building our Future print logo

Bridge Street, Port Melbourne - 063009-15VIC-RTR

Funding Program:Roads to Recovery Program
Status:Completed
Transport Mode:Road
Expected Start/Finish:Feb 2016 - Feb 2016
Australian Government Contribution:$306,503
Local Council/Shire:City of Port Phillip
State:VIC

Project Description

Deformed Asphalt surface has been identified through road inspections. The pavement surface has changed from originally constructed profile, which may directly influence the riding quality, water ponding and skid resistance. Asphalt resheeting improves pavement performance with regard to the strength and riding quality.

40mm depth asphalt overlay of the existing surface along 455.6m and various widths (area = 5555m2)

Disclaimer: The material contained in this site is made available on the understanding that the Department is not thereby engaged in rendering professional advice for a particular purpose. Before relying on the material in any important matter, users should carefully evaluate the accuracy, completeness and relevance of the information for their purposes and should obtain appropriate professional advice relevant to their particular circumstances.


Project details last updated: 10/05/2016