Department of Infrastructure, Regional Development and Cities print logo Building our Future print logo

Molesworth Dropmore Road, Molesworth - 063178-15VIC-RTR

Funding Program:Roads to Recovery Program
Status:In planning
Transport Mode:Road
Expected Start/Finish:Jan 2019 - Jan 2019
Australian Government Contribution:$73,012
State:VIC

Project Description

Flexural cracking detected. Crack on the west side of the crosshead on the first pier from the north, and on the east side of the crosshead on second pier from the north. Loss of batter protection at either abutment. Guard fence does not extend far off structure. Cracking of wearing surface over piers. Loss of asphalt at both approaches. Loss of paint along kerb.

Strengthen to prevent flexural cracking detected. Reinstate lost batter protection at either abutment. Patch repair to crack on the west side of the crosshead on the first pier from the north, and on the east side of the crosshead on second pier from the north. Resurface areas of lost asphalt at both approaches. Repaint along kerb.

Disclaimer: The material contained in this site is made available on the understanding that the Department is not thereby engaged in rendering professional advice for a particular purpose. Before relying on the material in any important matter, users should carefully evaluate the accuracy, completeness and relevance of the information for their purposes and should obtain appropriate professional advice relevant to their particular circumstances.


Project details last updated: 10/03/2018