Department of Infrastructure, Regional Development and Cities print logo Building our Future print logo

Brooks Cutting Road, Alexandra - 063183-15VIC-RTR

Funding Program:Roads to Recovery Program
Status:In planning
Transport Mode:Road
Expected Start/Finish:Jan 2019 - Jan 2019
Australian Government Contribution:$119,239

Project Description

Undermining at foot of piles. No approach guard fence present. Possible flexural cracking. Posts appear to be channels and look to have a large spacing. Rutting and potholing of Northern approach with settlement of both approaches. Cracking of asphalt layer above joints.

Review drawings for design load and carry out Level 3 inspection to determine if overloaded. Install rock beaching. Repair rutting and potholing of Northern approach with settlement of both approaches. Clean and reseal asphalt layer above joints. Provide upgraded support channels. Provide approach guard fence.

Disclaimer: The material contained in this site is made available on the understanding that the Department is not thereby engaged in rendering professional advice for a particular purpose. Before relying on the material in any important matter, users should carefully evaluate the accuracy, completeness and relevance of the information for their purposes and should obtain appropriate professional advice relevant to their particular circumstances.

Project details last updated: 10/03/2018