Department of Infrastructure, Regional Development and Cities print logo Building our Future print logo

Kukerin Road, Nyabing - 063376-15WA-RTR

Funding Program:Roads to Recovery Program
Status:Under construction
Transport Mode:Road
Expected Start/Finish:Jan 2016 - Jun 2018
Australian Government Contribution:$430,000
Local Council/Shire:Shire of Kent
State:WA

Project Description

With the recent change in access route to Cooperative Bulk Handling grain receival facility in Nyabing problems have arisen at and around the Kukerin Road access to the site but also for through traffic travelling this section of road. The works will address problems of a narrow roadway where heavy vehicle traffic is significant, road surface issues due to increased traffic, asphalt to the heavy vehicle access point to the Cooperative Bulk Handling site and drainage issues at various points along this section of road. The basis of the problem being addressed is one of asset protection/management.

Widen pavement, stabilise and seal to 7m. clear and widen to 12 metres drain width and improve drainage where required.

Disclaimer: The material contained in this site is made available on the understanding that the Department is not thereby engaged in rendering professional advice for a particular purpose. Before relying on the material in any important matter, users should carefully evaluate the accuracy, completeness and relevance of the information for their purposes and should obtain appropriate professional advice relevant to their particular circumstances.


Project details last updated: 10/08/2017