Wacol Station Road - 063424-16QLD-RTR

Funding Program:Roads to Recovery Program
Status:Completed
Transport Mode:Road
Expected Start/Finish:Jul 2016 - Jun 2018
Australian Government Contribution:$6,600,747
Local Council/Shire:Brisbane City Council
State:QLD

Project Description

• The timber bridge has deteriorated to a point that it can no longer cope with the heavy freight traffic requiring the use of an alternative 4km route • Load and speed restrictions have been in place for heavy vehicles to use the bridge • The flood immunity of the bridge over Wolston Creek (Q2) is lower than the appropriate standard • Pedestrian and cyclist facilities are substandard/non-existent.

The proposed work includes: • replacing the existing timber bridge with a new two lane concrete bridge to the west of the existing bridge • realigning the approaches to the bridge • raising the bridge level to improve flood immunity • installing a footpath on the new bridge.

Total cost of proposed project is $11,039,010

Disclaimer: The material contained in this site is made available on the understanding that the Department is not thereby engaged in rendering professional advice for a particular purpose. Before relying on the material in any important matter, users should carefully evaluate the accuracy, completeness and relevance of the information for their purposes and should obtain appropriate professional advice relevant to their particular circumstances.