Department of Infrastructure, Regional Development and Cities print logo Building our Future print logo

Dyer Street - 063548-16QLD-RTR

Funding Program:Roads to Recovery Program
Transport Mode:Road
Expected Start/Finish:Jul 2016 - Dec 2016
Australian Government Contribution:$233,000
Local Council/Shire:Sunshine Coast Regional Council

Project Description

The proposed section has the following defects: significant crocodile cracking, large depressions, potholes. The existing asphalt surface is old and oxidised. There are moderate failures in both the surface and pavement structure.

Pavement rehabilitation consisting in-situ stabilisation of the existing pavement and a new asphalt wearing surface using 50mm thick size 14mm dense graded asphalt.

Total cost of proposed project is $329,000

Disclaimer: The material contained in this site is made available on the understanding that the Department is not thereby engaged in rendering professional advice for a particular purpose. Before relying on the material in any important matter, users should carefully evaluate the accuracy, completeness and relevance of the information for their purposes and should obtain appropriate professional advice relevant to their particular circumstances.

Project details last updated: 10/02/2017