Perup Road (rural road) - 063721-16WA-RTR

Funding Program:Roads to Recovery Program
Status:Completed
Transport Mode:Road
Expected Start/Finish:Sep 2016 - Dec 2017
Australian Government Contribution:$100,000
Local Council/Shire:Shire of Manjimup
State:WA

Project Description

The existing seal measures less than four metres in width and the existing road formation is less than 8 metres in width.

Where necessary, lengthen exiting culverts so that they are wide enough to allow construction of the road to the design width. replace sub standard culverts. Place culverts on road intersections. Realign intersection with Ducton Road to acceptable angle. Form road formation to 8 metres in width. Import, spread and compact 150 milimetres of compacted gravel. Place six metre wide spray seal. Place guideposts and linemarking as per appropriate guidelines and Standards.

Total cost of proposed project is $435,000

Disclaimer: The material contained in this site is made available on the understanding that the Department is not thereby engaged in rendering professional advice for a particular purpose. Before relying on the material in any important matter, users should carefully evaluate the accuracy, completeness and relevance of the information for their purposes and should obtain appropriate professional advice relevant to their particular circumstances.