Windy Harbour Road (rural road) - 063723-16WA-RTR

Funding Program:Roads to Recovery Program
Status:Completed
Transport Mode:Road
Expected Start/Finish:Nov 2016 - May 2017
Australian Government Contribution:$103,249
Local Council/Shire:Shire of Manjimup
State:WA

Project Description

The existing pavement width is between 5.5 metres and 6.0 metres with narrow shoulders and does not conform to the requirements of the Shire's Road Hierarchy. Sections have significant rutting and incorrect cross falls resulting in weater settling in wheel paths and/or the centre of the road. No formed table drains exist.

Where necessary, lengthen exiting culverts so that they are wide enough to allow construction of the road to the design width. replace sub standard culverts. Place or replace culverts on road intersections (as necessary). Form road formation to 8 metres in width. Import, spread and compact 150 milimetres of compacted gravel. Place six metre wide spray seal. Place guideposts and linemarking as per appropriate guidelines and Standards

Total cost of proposed project is $458,936

Disclaimer: The material contained in this site is made available on the understanding that the Department is not thereby engaged in rendering professional advice for a particular purpose. Before relying on the material in any important matter, users should carefully evaluate the accuracy, completeness and relevance of the information for their purposes and should obtain appropriate professional advice relevant to their particular circumstances.


Project details last updated: 10/10/2017