Department of Infrastructure, Regional Development and Cities print logo Building our Future print logo

Dalby-Nungil Road, Dalby District - 064113-16QLD-RTR

Funding Program:Roads to Recovery Program
Status:Completed
Transport Mode:Road
Expected Start/Finish:Jul 2016 - Nov 2016
Australian Government Contribution:$300,000
State:QLD

Project Description

The existing condition of the road has been rated as very poor. Based on the road condition and the existing width of the sealed road being inadequate for an approved road train route the above sections of the Dalby Nungil Road has been scheduled for reconstruction. Full width sections of the Dalby Nungil road were reconstructed under the approved works for NDRRA (2013 flood damage). The above work locations links the flood damage works to created a continuous section of newly reconstructed road.

The work entails reconstructing a rural collector road to Councils current standards, taking the road from a substandard 6.0m bitumen seal road with a condition rating of 7 out of 10 to a 7.0m wide bitumen seal with a 8.0m formation

Total cost of proposed project is $700,000

Disclaimer: The material contained in this site is made available on the understanding that the Department is not thereby engaged in rendering professional advice for a particular purpose. Before relying on the material in any important matter, users should carefully evaluate the accuracy, completeness and relevance of the information for their purposes and should obtain appropriate professional advice relevant to their particular circumstances.


Project details last updated: 10/02/2017