Department of Infrastructure, Regional Development and Cities print logo Building our Future print logo

Bundi Road Horse Creek Bridge, Wandoan District - 064116-16QLD-RTR

Funding Program:Roads to Recovery Program
Status:Completed
Transport Mode:Road
Expected Start/Finish:Mar 2017 - Dec 2017
Australian Government Contribution:$1,406,713
State:QLD

Project Description

The existing bridge condition has been assessed as very poor due to rotting, termite activity, and failure of multiple components throughout. The existing bridge is currently load limited to 5t and is 3.7m width, insufficient for use by the volume and composition of traffic recorded for this road segment.

The works proposed include the replacement of the existing bridge with a modern concrete bridge, or equivalent, capable of transporting modern size vehicles of increased load and width than that catered to by the existing structure.

Total cost of proposed project is $2,027,000

Disclaimer: The material contained in this site is made available on the understanding that the Department is not thereby engaged in rendering professional advice for a particular purpose. Before relying on the material in any important matter, users should carefully evaluate the accuracy, completeness and relevance of the information for their purposes and should obtain appropriate professional advice relevant to their particular circumstances.


Project details last updated: 10/02/2018