Department of Infrastructure, Regional Development and Cities print logo Building our Future print logo

Imanpa Access Road - 064201-16NT-RTR

Funding Program:Roads to Recovery Program
Transport Mode:Road
Expected Start/Finish:Oct 2016 - Oct 2016
Australian Government Contribution:$149,601

Project Description

Road is dusty, very loose and corrugated.

Grade the area between the inverts of both table drains. Win material from the area between the inverts of both table drains and the edges of the shoulders. Cut the pavement and shoulders to remove all corrugations and fill in all ruts, holes and depressions. Spread the accumulated material uniformly over the pavement and shoulders to fill depressions and to obtain the NTG typical cross section standard. Wet mix and roll to produce a uniform and tightly bound surface free of corrugations, ruts and depressions. Compact to 95% MMDD with 4% two way cross fall. Reinstate table drain blocks.

Disclaimer: The material contained in this site is made available on the understanding that the Department is not thereby engaged in rendering professional advice for a particular purpose. Before relying on the material in any important matter, users should carefully evaluate the accuracy, completeness and relevance of the information for their purposes and should obtain appropriate professional advice relevant to their particular circumstances.

Project details last updated: 10/02/2017