Rowley Road, Burpengary - 064342-16QLD-RTR

Funding Program:Roads to Recovery Program
Status:Completed
Transport Mode:Road
Expected Start/Finish:Nov 2016 - Mar 2017
Australian Government Contribution:$877,949
Local Council/Shire:Moreton Bay Regional Council
State:QLD

Project Description

The existing road pavement has deteriorated below an acceptable level. Significant areas of the pavement are exhibiting crocodile cracking, longitudinal and AC joint cracking. The pavement is currently at the early stages of distress as rutting, deformation and pavement failures are throughout the length of the project area

Rehabilitation of the pavement 680m in length and 9.2m in average width for road safety and to return pavement to required level of service. Other options for the provision of corridor improvements will be investigated. These improvements may include on road cycle facilities, pedestrian pathway links and improvements, traffic safety initiatives and the provision of street tree planting to improve visual amenity and to provide shade. A review of existing signage to allow for the removal of non-essential signage from the corridor will also be investigated.

Total cost of proposed project is $1,502,853

Disclaimer: The material contained in this site is made available on the understanding that the Department is not thereby engaged in rendering professional advice for a particular purpose. Before relying on the material in any important matter, users should carefully evaluate the accuracy, completeness and relevance of the information for their purposes and should obtain appropriate professional advice relevant to their particular circumstances.


Project details last updated: 10/08/2017