Department of Infrastructure, Regional Development and Cities print logo Building our Future print logo

Lawnton Pocket Road, Lawnton - 064343-16QLD-RTR

Funding Program:Roads to Recovery Program
Status:Completed
Transport Mode:Road
Expected Start/Finish:Feb 2017 - Apr 2017
Australian Government Contribution:$170,000
Local Council/Shire:Moreton Bay Regional Council
State:QLD

Project Description

The existing road pavement has deteriorated below an acceptable level. The road surface had a significant portion of rutting/deformation and crocodile cracking. The ride comfort was described as fair with intermittent bumps or depressions. Drainage will be addressed simultaneously to ensure longevity of the new pavement.

The project scope includes the rehabilitation of the subject section 260 m in length and 6.7 m in width. The objective of the project is to bring the road pavement to a desirable level of service as the existing road pavement has deteriorated below an acceptable level. Drainage will be addressed simultaneously to ensure longevity of the new pavement.

Disclaimer: The material contained in this site is made available on the understanding that the Department is not thereby engaged in rendering professional advice for a particular purpose. Before relying on the material in any important matter, users should carefully evaluate the accuracy, completeness and relevance of the information for their purposes and should obtain appropriate professional advice relevant to their particular circumstances.


Project details last updated: 10/08/2017