Glen Davis Road (Capertee) - 064894-16NSW-RTR

Funding Program:Roads to Recovery Program
Status:Completed
Transport Mode:Road
Expected Start/Finish:Jul 2017 - Aug 2017
Australian Government Contribution:$233,404
Local Council/Shire:City of Lithgow Council
State:NSW

Project Description

Inadequate drainage and poor quality seal has caused pavement and edge failure over a 2km section. Such failures include severe potholing, edge cracking and surface depressions.

The seal for this 2km section will be removed in sections where the road has degraded. In these areas, the subsurface will be ripped and blended with high quality road base. The road base will then be sufficiently compacted and allowed to sit for two weeks prior to seal to determine any further subsurface deficiencies in these areas. Upon rectification of any further issues, a two-coat 20/10 seal will be laid to replace that which was removed. Table drains will be reformed and stormwater culverts and pipes will be cleared to rectify drainage issues.

Disclaimer: The material contained in this site is made available on the understanding that the Department is not thereby engaged in rendering professional advice for a particular purpose. Before relying on the material in any important matter, users should carefully evaluate the accuracy, completeness and relevance of the information for their purposes and should obtain appropriate professional advice relevant to their particular circumstances.