Main Street (Wallerawang) - 064895-16NSW-RTR

Funding Program:Roads to Recovery Program
Status:Completed
Transport Mode:Road
Expected Start/Finish:Feb 2017 - Jun 2017
Australian Government Contribution:$58,946
Local Council/Shire:City of Lithgow Council
State:NSW

Project Description

Surface instability, aged seal, aged pavement and recent water/sewer mains replacement have caused consistent pavement failure over this 300m section in the CBD of Wallerawang. Such failures include severe surface cracking, surface depressions, ravelling, rutting and potholing.

The seal for this 300m section will be entirely removed and the pavement will be ripped and blended with new, suitable quality road base. The subsurface will then be compacted prior to the application of a hotmix seal by external contractor.

Disclaimer: The material contained in this site is made available on the understanding that the Department is not thereby engaged in rendering professional advice for a particular purpose. Before relying on the material in any important matter, users should carefully evaluate the accuracy, completeness and relevance of the information for their purposes and should obtain appropriate professional advice relevant to their particular circumstances.