Department of Infrastructure, Regional Development and Cities print logo Building our Future print logo

Parkers Road, Torrens Park - 064907-16SA-RTR

Funding Program:Roads to Recovery Program
Status:Completed
Transport Mode:Road
Expected Start/Finish:Dec 2016 - Jun 2017
Australian Government Contribution:$264,855
Local Council/Shire:City of Mitcham
State:SA

Project Description

The kerb and water table on both sides of Parkers Road are in poor condition due to environmental factors and their age. The road pavement is deformed resulting in poor ride ability. The road seal is a 21 year old spray sealed surface which has significant stone loss. Parkers Road is 325 meters in length and is classified as a “Local” road with a vehicle traffic volume of less than 100 vehicles per day

It is proposed to replace all of the kerbing on both sides of Parkers Road. The kerb replacement will be followed by the removal of the road seal and pavement. The road will be replaced with a deep lift Asphalt pavement followed with 40mm Asphalt seal. The project is in conjunction with Braemar Road and Kays Road

Disclaimer: The material contained in this site is made available on the understanding that the Department is not thereby engaged in rendering professional advice for a particular purpose. Before relying on the material in any important matter, users should carefully evaluate the accuracy, completeness and relevance of the information for their purposes and should obtain appropriate professional advice relevant to their particular circumstances.


Project details last updated: 10/08/2017