Department of Infrastructure, Regional Development and Cities print logo Building our Future print logo

Wellington Parade South Jolimont - 065229-16VIC-RTR

Funding Program:Roads to Recovery Program
Transport Mode:Road
Expected Start/Finish:Oct 2016 - Nov 2016
Australian Government Contribution:$400,000
Local Council/Shire:Melbourne City Council (City of Melbourne)

Project Description

The existing asphalt road surface is oxidised with a fatigued appearance and has numerous service utility trench reinstatements and substantial longitudinal and transverse cracking impacting on rideablity performance

Proposed to cold plane profile the existing road surface to a depth of 50 millimetres for a length of 365 metres and a width of 16 metres and resheet over the whole area with both 10 mm type H hot mix asphalt wearing course in traffic lanes and 10mm type V hot mix asphalt at approaches to intersections all to a depth of 50 mm

Disclaimer: The material contained in this site is made available on the understanding that the Department is not thereby engaged in rendering professional advice for a particular purpose. Before relying on the material in any important matter, users should carefully evaluate the accuracy, completeness and relevance of the information for their purposes and should obtain appropriate professional advice relevant to their particular circumstances.

Project details last updated: 10/02/2017