Department of Infrastructure, Regional Development and Cities print logo Building our Future print logo

Beamish Street - 065344-16NSW-RTR

Funding Program:Roads to Recovery Program
Status:Under construction
Transport Mode:Road
Expected Start/Finish:Jan 2017 - Apr 2017
Australian Government Contribution:$500,000
State:NSW

Project Description

The condition of concrete road pavement has been deteriorated with a number of slabs have failed or subsided creating steps. The failed and subsided pavement slabs require replacement and the longitudinal and transverse joints require resealing. Pavement area = 2,000 sq.m

The work includes replacement of failed or subsided concrete pavement slabs and resealing of the longitudinal and transverse joints between pavement slabs.

Disclaimer: The material contained in this site is made available on the understanding that the Department is not thereby engaged in rendering professional advice for a particular purpose. Before relying on the material in any important matter, users should carefully evaluate the accuracy, completeness and relevance of the information for their purposes and should obtain appropriate professional advice relevant to their particular circumstances.


Project details last updated: 10/02/2017