Waterside Crescent - 065354-16NSW-RTR

Funding Program:Roads to Recovery Program
Status:Under construction
Transport Mode:Road
Expected Start/Finish:Apr 2017 - Jun 2017
Australian Government Contribution:$350,000
State:NSW

Project Description

The pavement is in poor condition with the evident of fatigue cracking, ravelling and potholes. The road pavement requires the strengthening structurally and resurfacing. Kerb and gutter also is in poor condition and requires reconstruction both sides. Pavement area = 4,800sq.m and Kerb and Gutter = 800 metres

Reconstruct the kerb and gutter both sides and single coat spray seal and resurfacing the pavement with 40mm AC10

Disclaimer: The material contained in this site is made available on the understanding that the Department is not thereby engaged in rendering professional advice for a particular purpose. Before relying on the material in any important matter, users should carefully evaluate the accuracy, completeness and relevance of the information for their purposes and should obtain appropriate professional advice relevant to their particular circumstances.


Project details last updated: 10/04/2017