Jude Street - 065637-16NSW-RTR

Funding Program:Roads to Recovery Program
Status:Completed
Transport Mode:Road
Expected Start/Finish:Aug 2016 - Dec 2016
Australian Government Contribution:$39,930
State:NSW

Project Description

Existing gravel surface has lost its original shape and hold water when wet. Large potholes have developed and constant maintenance requires. The section of the road has poor drainage on the south side of the road fronting the properties.

Rework existing gravel pavement lay and compact 100mm layer of DGB20 pavement material. Table drain is to be regarded and replace existing drainage pipes with 300mm and 375mm pipes. Spray 10mm primer seal. Line marking and erection of roadside furniture.

Disclaimer: The material contained in this site is made available on the understanding that the Department is not thereby engaged in rendering professional advice for a particular purpose. Before relying on the material in any important matter, users should carefully evaluate the accuracy, completeness and relevance of the information for their purposes and should obtain appropriate professional advice relevant to their particular circumstances.


Project details last updated: 10/09/2017