Department of Infrastructure, Regional Development and Cities print logo Building our Future print logo

Myocum Rd Segment 545.10 CH0.6-1.04km (Rural) - 065990-16NSW-RTR

Funding Program:Roads to Recovery Program
Status:Completed
Transport Mode:Road
Expected Start/Finish:Sep 2016 - Jun 2017
Australian Government Contribution:$667,883
Local Council/Shire:Byron Shire Council
State:NSW

Project Description

Reconstruct failed pavement and failed wearing surface. Current state of road contains large areas of uneven patwork of pothole repairs.

Current proposal is to incorporate a 250mm gravel pavement overly to existing road. Widen road by .5m each side. Placement of kerb and gutter in cut areas. Placement of subsoil drainage. Replacement of exisiting stormwater drains.

Disclaimer: The material contained in this site is made available on the understanding that the Department is not thereby engaged in rendering professional advice for a particular purpose. Before relying on the material in any important matter, users should carefully evaluate the accuracy, completeness and relevance of the information for their purposes and should obtain appropriate professional advice relevant to their particular circumstances.


Project details last updated: 10/08/2017