Department of Infrastructure, Regional Development and Cities print logo Building our Future print logo

Butter Factory Road, Wallace - 066304-16VIC-RTR

Funding Program:Roads to Recovery Program
Status:Completed
Transport Mode:Road
Expected Start/Finish:Feb 2017 - May 2017
Australian Government Contribution:$300,000
Local Council/Shire:Moorabool Shire Council
State:VIC

Project Description

Butter Factory Road, is has a narrow road pavement where the shoulders require regular maintenance due to traffic volumes. The existing single span concrete bridge over the Moorabool West River is under capacity and only a single lane.

Widening of the pavement and construction of shoulders. Improvements to drainage and new linemarking and guideposts. Based on an engineering assessment of the bridge it requires replacement. The existing bridge will be replaced with a dual lane bridge which will provide for the required load limits.

Disclaimer: The material contained in this site is made available on the understanding that the Department is not thereby engaged in rendering professional advice for a particular purpose. Before relying on the material in any important matter, users should carefully evaluate the accuracy, completeness and relevance of the information for their purposes and should obtain appropriate professional advice relevant to their particular circumstances.


Project details last updated: 17/05/2017